Analisis Efisiensi Penanganan Longsoran Menggunakan DPT Borepile dan Geotextile Ditinjau dari Aspek Biaya

Ananda Salsabila Ambarwati, Putri Nurul Kusuma Whardani

Abstract


Landslides are one of the geotechnical problems that often occur in slopes and soft soil areas, especially on roads with peat soil conditions and high traffic volumes, such as the Simpang Niam–Lubuk Kambing STA 17+070 National Road. Changes in the 2025 budget efficiency policy have resulted in the landslide mitigation method, which was originally planned to use Borepile retaining walls (DPT), being changed to a Geotextile method, thus requiring a comparative study of the cost aspects. This study aims to analyze and compare the cost effectiveness of the bored pile retaining wall and Geotextile methods at the location. The research methods include collecting technical field data, calculating the volume of work, analyzing the unit price of work (AHSP), and preparing a Budget Plan (RAB) for each alternative. The analysis results show that the total cost of work using the DPT Borepile method is IDR 7,808,047,000, while the Geotextile method is IDR 7,151,225,000. There is a cost difference of IDR 656,822,000 or about 8.4% more economical in the Geotextile method. Based on these results, the Geotextile method is considered more economically efficient and contributes to the optimization of budget utilization in landslide management projects on peatlands.

Keywords


Cost; DPT Borepile; Geotextile; Landslide.

Full Text:

PDF

References


D. Yusuf, V. R. R. . Hutubessy, & M. D. Soumokil. (2024). PERENCANAAN DINDING PENAHAN BADAN JALAN TIPE GRAVITASI STUDI KASUS : PENINGKATAN JALAN HARUKU-OMA RUAS JALAN ABORU-HARUKU. 3(1), 43–53.

Handayani, M., & Aryanto, Y. (2013). PENANGANAN LONGSORAN RUAS JALAN PRUPUK-BTS. BANYUMAS (CIREGOL, KEC. TONJONG, KAB. BREBES) PADA KM. PKL 115+550 s/d KM. PKL 115+650. https://ejournal3.undip.ac.id/index.php/jkts/article/view/3994/3889

Isdianto, I., & Agustina, D. H. (2023). Analisis Stabilitas Lereng Dengan Perkuatan Dinding Penahan Tanah Menggunakan Program Plaxis (Studi Kasus : Ruas Jalan Gesek-Simpang Busung. Kabupaten Bintan). SIGMA TEKNIKA, 6(2), 493–502. https://doi.org/10.33373/sigmateknika.v6i2.5665

Karya, J., & Sipil, T. (2014). ANALISIS STABILITAS LERENG DAN ALTERNATIF PENANGANANNYA : STUDI KASUS LONGSORAN PADA RUAS JALAN PRINGSURAT KM. MGL. 22+631-22+655 KABUPATEN TEMANGGUNG (Vol. 3, Number 4). Halaman. http://ejournal-s1.undip.ac.id/index.php/jkts

Misnawati, M., & Lianto, W. (2025). PERANCANGAN KONSTRUKSI PENAHAN LONGSORAN DENGAN MENGGUNAKAN ALTERNATIF KONSTRUKSI GEOTEXTILE WALL. KNOWLEDGE: Jurnal Inovasi Hasil Penelitian Dan Pengembangan, 5(2), 493–503. https://doi.org/10.51878/knowledge.v5i2.5780

Dikretorat Jendral Bina Kontruksi Kementrian Pekerjaan Umum, “Surat Edaran Direktur Jenderal Bina Konstruksi Nomor 30 Tahun 2025 tentang Tata Cara Penyusunan Perkiraan Biaya Pekerjaan Konstruksi Bidang Pekerjaan Umum dan Perumahan Rakyat,” 2025.

Pemerintah Provinsi Jambi, “Penetapan Standar Satuan Harga di Lingkungan Pemerintah Provinsi Jambi Tahun Anggaran 2025”, 2025.

Satuan Kerja Perencanaan dan Pengawasan Jalan Nasional (P2JN), “Perhitungan Teknik dan Penggambaran Detail Perencanaan Longsoran Pada Ruas Jalan Penghubung Lintas Ruas 41 (SP. Niam-Lubuk Kambing) Tahun Anggaran 2023”, 2025.




DOI: http://dx.doi.org/10.33087/civronlit.v11i1.182

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Civronlit Unbari
Publisher: Fakultas Teknik Universitas Batanghari Jambi
Jl. Slamet Ryadi, Broni-Jambi, Kodepos: 36122, Phone: 0741-668280, email: civronlit.unbari@gmail.com

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.