Faktor-Faktor Manajemen Material dalam Percepatan Pelaksanaan Proyek Konstruksi Padang Pariaman
Abstract
In the implementation of construction projects, the application of material management shows an influence on the smoothness of project work time, therefore it is necessary to examine and describe what parts of material management have an influence and how much influence they have. Based on literature studies and interviews and the author's experience as a project actor, a study was conducted to obtain the most influential factors in accelerating the implementation time of construction projects in Padang Pariaman Regency. The study was conducted using a Likert scale questionnaire method which was distributed to project actors as respondents and after that validity, reliability and factor analysis were tested on respondents' answers using SPSS. The results of the study obtained 2 new factors related to project material management, namely the first factor of inventory and warehousing control and the second factor was the factor of selecting specifications and material scheduling. The results obtained were quite unexpected because the specification selection factor is rarely discussed and used as a consideration when discussing the project implementation time, however, with the emergence of this factor, we as project actors are aware that this specification selection factor is very important in accelerating construction work in the Padang Pariaman Regency area.
Keywords
Full Text:
PDFReferences
Asnuddin, Setyadi et al. (2018). Penerapan Manajemen Konstruksi pada Tahap Controlling Proyek (Studi Kasus: Bangunan Laboratorium Fakultas Taknik Universitas Sam Ratulangi Manado), Jurnal Sipil Statik 6, 11, 895-906
Bawimbang, Rebertha M. et al. (2020). Pengendalian Material Proyek dengan Metode Material Requirement Planning (MRP) pada Pembangunan Office and Distribution Center Airmandidi, Minahasa Utara Sulawesi Utara. Jurnal Sipil Statik 8, 1, 127-134.
Hidayat, Anwar, 2014 Penjelasan Analisis Faktor PCA dan CFA, https://www.statiskian.com/2014/03/analisis-faktor.html
Huqban, et al. (2020). Analisis Keterlambatan Penyediaan Material terhadap Ketepatan Waktu Pembangunan, Jurnal Teslink: Teknik Sipil dan Lingkungan 2, 1, 35-43.
Ilyas, Budi. (2023). Analisis Faktor-faktor Utama yang Mempengaruhi Daya Saing Kontraktor di Sumatera Barat. Thesis, Program Magister Teknik Sipil Fakultas Teknik Universitas Bung Hatta.
Kiranasari, Ravinda Wahyu. (2020). Penentuan Faktor bagi Analisis Faktor Keberhasilan Proyek Preservasi Jalan Skema Long Segmen. Jurnal Manajemen Aset Infrastruktur & Fasilitas, Departemen Teknik Sipil ITS, 4, 2.
Kurniawan, Hendi dan Anggraeni, Ida Ayu Ari. (2020). Analisis Risiko Rantai Pasok Material Terhadap Keterlambatan Proyek Konstruksi, Rekayasa Sipil, 14, 1, 43-50.
Limbong, Inggried et al. (2013). Manajemen Pengadaan Material Bangunan dengan Menggunakan Metode MRP (Material Require Planning (Studi Kasus: Revitalisasi Gedung Kantor BPS Provinsi Sulawesi Utara). Jurnal Sipil Statik 1, 6, 421-429.
Mahapatni, Ida Ayu Putu Sri. (2019). Metode Perencanaan dan Pengendalian Proyek Konstruksi, Cetakan Pertama, ISBN: 978-623-91211-0-5, UNHI Press, Denpasar –Bali
Maikal, Muhamad. (2017). Pengadaan Material Proyek Konstruksi Menggunakan Teknik Pemesanan EOQ dan PBB, Faktor Exacta 10, 3, 191-198.
Mardiaman, dan Siregar J. (2023). Analisis Deviasi Kemajuan Pekerjaan Berdasarkan Presentase Durasi Waktu pada Pekerjaan Konstruksi Bangunan, Menara: Jurnal Teknik Sipil, 18,1, 59-65.
Maulana, A. (2022). Analisis Validtas, Reliabilitas, dan Kelayakan Instrumen Penilaian Rasa Percaya Diri Siswa. Jurnal Kualita Pendidikan, 3(3), 133-139.
Natalia, Monika et al. (2017) Analisis Critical Success Factors Proyek Konstruksi di Kota Padang, Fondasi: Jurnal Teknik Sipil 6, 2.
Novarian, Muhammad Rizky. (2019). Analisis Risiko Penyimpanan Material Besi Baja di Luar Gudang Fabrikasi Baja di Luar Gudang Fabrikasi Baja PT Swadaya Graha Menggunakan Metode Failure Mode and Effect Analisys (FMEA). Undergraduate thesis, Universitas Internasional Semen Indonesia.
Pratiwi, Reno. (2021). Pengendalian Kualitas pada Corrugated Concrete Sheet Pile dengan Metode Six Sigma Quality Control on Corrugated Concrete Sheet Pile with The Six Sigma Method, Jurnal Penelitian TRANSUKMA 3, 2.
Santika, Gede Dharmana Dwi. (2023). Analisis Kinerja Supply Chain Management Terhadap Efisiensi Biaya dan Waktu Pekerjaan Struktur Proyek SMPN 5 Abiansemal. Prosiding Seminar Nasional Ketekniksipilan Bidang Vokasional XI, 2, 1.
Saragi, Tiurma Elita dan Situmorang, Ruth Uli A. (2022). Optimasi Waktu dan Biaya Percepatan Proyek Menggunakan Metode Time Cost Trade Off dengan Alternatif Penambahan Tenaga Kerja. Construct: Jurnal Teknik Sipil 1, 2, 53.
Sugiyono. (2019). Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: Alfabeta
Sujarweni, V. Wiratna. (2014). SPSS untuk Penelitian, Pustaka Baru Press, Yokyakarta.
Wiharno, Oei et al. (2022). Studi Perbandingan Estimasi Bill of Quantity pada Pekerjaan Penulkangan Pile Cap, Pillar Tunggal dan Ganda Jalan Layang antara Metode Konvensional dan BIM (Building Information Modelling). Other thesis, Universitas Katholik Soegijapranata Semarang.
DOI: http://dx.doi.org/10.33087/civronlit.v10i1.142
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Jurnal Civronlit Unbari
Publisher: Fakultas Teknik Universitas Batanghari Jambi
Jl. Slamet Ryadi, Broni-Jambi, Kodepos: 36122, Phone: 0741-668280, email: civronlit.unbari@gmail.com

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.