Evaluasi Pengendalian Waktu dengan Metode Time Cost Trade Off pada Proyek Fiberline Building And Relocation New Area Woodyard

Elvira Handayani, M. Immanuddin

Abstract


Projects generally have a deadline, meaning that the project must be completed before or on time. In connection with this project problem, the success of a project can be measured from three things, namely, cost, quality and timeliness of completion. Many efforts must be made in order to achieve what has been planned, including calculating the correct strength of the structure, calculating cost estimates that are effective and economical. In implementing the construction of the Fiberline 3 Building (FL3B) & Relocation New Area Woodyard PT project. Riau Andalan Pulp And Paper indicated that there was a delay in the Excavation, Bacfilling & Cutting/Breaking Top Of Pile work, therefore the researchers accelerated it by rescheduling. This is intended so that this project can be completed according to the planned target. The method that will be used to speed up the duration of the project in this research is the Time Cost Trade Off method or also called the cost versus time exchange method. Based on the results of the Time Cost Trade Off Analysis on the Fiberline 3 Building project (FL3B) & Relocation New Area Woodyard PT. Riau Andalan Pulp And And Paper, it can be concluded as follows: Acceleration of project duration for the alternative of increasing overtime working hours by 4 (four) hours is obtained:The optimum time to accelerate the project duration is 142 calendar days with an increase in direct costs from Rp. 3,145,559,610.00 to Rp. 3,346,947,482.50. The total optimum project cost due to accelerated project duration increased from Rp. 3,806,175,528.10 to Rp. 4,007,523,400.60. Acceleration of project duration for the alternative of increasing the number of workers was obtained. The optimum time for accelerating the project duration was 142 calendar days with an increase in direct costs from Rp. 3,145,559,610.00 to Rp. 3,220,683,352.66 Total optimum project costs due to accelerated project duration increased from Rp. 3,806,175,528.10 to Rp. 3,881,259,270.76.


Keywords


Time Acceleration, Time Cost Trade Off

Full Text:

PDF

References


Anonim, 2004, Keputusan Menteri Tenaga Kerja dan Transmigrasi Republik Indonesia Nomor KEP.102/MEN/VI/2004 Waktu kerja Lembur dan Upah Kerja Lembur, Jakarta: Departemen PU.

Ady Imam Afrizal, Time cost trade off analisys untuk pengoptimalan waktu dan biaya proyek Program studi teknik industri fakultas teknologi industri universitas islam indonesia Yogyakarta, 2018

Bagus Budi Setiawan, analisis pertukaran waktu dan biaya dengan metode time cost trade off (tcto) pada proyek pembangunan gedung di jakarta, Teknik Sipil Universitas Muhammadiyah Jakarta

Cindy G. Salindeho, Pingkan A. K. Pratasis , Febrina P. Y. Sumanti, Optimasi Waktu Dan Biaya Menggunakan Metode Time Cost Trade Off Pada Proyek Peningkatan Ruas Jalan Tondano–Kembes–Manado Seksi II, TEKNO – Volume 20 Nomor 81 – Agustus 2022 Universitas Sam Ratulangi

Gulo, Jernih Putri N. 2014, Analisa Percepatan Durasi Proyek Dengan Metode Pertukaran Waktu dan Biaya Proyek Perumahan Cemara Kuta, Medan: Universitas Sumatera Utara.

Husen, Abrar, 2009, Manajemen Proyek, Yogyakarta: Andi

Luthan, Putri Lynna A, dan Syafriadi, 2006, Aplikasi Microsoft Project untuk Penjadwalan Kerja Proyek Teknik Sipil. Yogyakarta: Andi.

Maia, Jaime ximenes soares (2017) analisis percepatan penjadwalan pembangunan gedung ibadah di dili dengan metode time cost trade off (tcto. Masters thesis, ITN Malang.

Nurazizah, Firdasari,mMeilandy Purwandito Penerapan Metode Time Cost TradeOff dalam Optimalisasi Biaya dan Jadwal Proyek Laboratorium Dasar Universitas Samudra, program Studi Teknik Sipil, Universitas Samudra, Indonesia Volume 6 No. 1 April 2023

Nehan Abhy Kharismawan, pengendalian waktu dan biaya dengan metode time cost trade off (Studi Kasus : Proyek Pembangunan Gedung SATPAS Polres Banyuwangi) jurusan teknik sipil fakultas teknik universitas muhammadiyah malang 2022

Okyta Putri Cahya Ardika, Sugiyarto , Fajar Sri Handayani, Mahasiswa Fakultas Teknik, Jurusan Teknik Sipil, Uiversitas Sebelas Maret, analisis time cost trade off dengan penambahan jam kerja pada proyek konstruksi (studi kasus : proyek pembangunan jalan tol bogor ring road seksi ii a) e-jurnal matriks teknik sipil/september 2014/

Riyawanto, Rindra Ilham (2017) analisa percepatan waktu pelaksanaan proyek dengan metode time cost trade off (tcto). Skripsi thesis, ITN Malang.

Soeharto, Iman, 1999, Manajemen Proyek: Dari Konseptual Sampai Operasional Jilid 1, Jakarta: Erlangga.

Saputro Rois, 2015, Analisa Percepatan dengan Metode Time Cost Trade Off Proyek Pembangunan Hotel Ijen Padjajaran Malang, Malang: Institut Teknologi Nasional Malang.

Santoso, Budi. 2003, Manajemen Proyek, Surabaya: Penerbit Guna Widya.

Wawan kurniawan, analisa metode time cost trade off pada pelaksanaan proyek pembangunan gedung the samator surabaya, Jurusan Teknik Sipil Fakultas Teknik Sipil dan Perencanaan Institut Teknologi Sepuluh Nopember Surabaya 2015

Widianto, Roziq (2017) evaluasi percepatan waktu dengan metode time cost trade off (tcto) pada proyek pembangunan laboratorium sumber daya air teknik pengairan universitas brawijaya. Skripsi thesis, ITN Malang.




DOI: http://dx.doi.org/10.33087/civronlit.v8i2.120

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Jurnal Civronlit Unbari
Publisher: Fakultas Teknik Universitas Batanghari Jambi
Jl. Slamet Ryadi, Broni-Jambi, Kodepos: 36122, Phone: 0741-668280, email: civronlit.unbari@gmail.com

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.